DD/MM/YYYY
Sr. No Subject Date Division Download / Link
331 Appointment to the post of Director (Technical), Punatsangchhu -I Hydroelectric Project Authority, Bhutan 05/03/2020 BBMB (1.59 MB)
332 Appointment to the post of Chairman, Damodar Valley Corporation (DVC) on deputation basis through Search-cum-Selection Committee (SCSC) 03/03/2020 BBMB (3.44 MB)
333 PUBLIC NOTICE for extension of timeline Draft revised Standard Bidding Documents (SBDs) in connection with selection of Transmission Service Provider (TSP) through Tariff Based Competitive Bidding (TBCB) Extended 02/03/2020 Transmission (501.21 KB)
334 PUBLIC NOTICE for Draft revised Standard Bidding Documents (SBDs) in connection with selection of Transmission Service Provider (TSP) through Tariff Based Competitive Bidding (TBCB) 05/02/2020 Transmission (5.37 MB)
335 Reduction in cost of power due to prepayment by end consumers 27/01/2020 R&R (369.75 KB)
336 Minutes of the Conference of the Power Ministers of States and UTs held on 10th – 11th October, 2019 at Tent City, Narmada, Gujarat 24/01/2020 Coordination (632.28 KB)
337 Vacancy Circular regarding Filling up the post of Technical Member, Appellate Tribunal for Electricity (APTEL) 07/01/2020 R&R (1.42 MB)
338 RFQ for Inviting Bid for EVACUATION OF POWER FROM RE SOURCES IN KARUR/TIRUPPUR WIND ENERGY ZONE (TAMIL NADU) (2500 MW) THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS 26/12/2019 Transmission (1.19 MB)
339 Notification for Inviting Bid for EVACUATION OF POWER FROM RE SOURCES IN KARUR/TIRUPPUR WIND ENERGY ZONE (TAMIL NADU) (2500 MW) THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS 26/12/2019 Transmission (383.61 KB)
340 Filling up the post of Director (Technical), North Eastern Electric Power Corporation (NEEPCO) Limited, a schedule 'A' CPSE 17/12/2019 Hydel I (1.36 MB)
341 Filling up the post of Director (Human Resource), POSOCO, a schedule 'A' CPSE 13/12/2019 OM
342 Inviting application for appointment to the post of Member (Economic and Commercial) in the CEA on deputation/short term contract basis 05/12/2019 Admin I (2.54 MB)
343 Methodology for allocation of coal as per provisions of Para B (viii) (a) covering Para B(iii) of SHAKTI Policy of Ministry of Coal amended as per Para 2.1 (a) of HLEC Recommendations 02/12/2019 R&R (2.59 MB)
344 Reduction in cost of power due to Pre Payment in entire value chain of Power Sector 16/11/2019 R&R (764.02 KB)
345 Waiver of inter-state transmission charges and losses on transmission of the electricity generated from solar and wind sources of energy under para 6.4 (6) of the revised Tariff Policy, 2016 Order dated 6.11.2019 13/11/2019 R&R (921.63 KB)
346 Selection for the post of Director (Projects), Power Grid Corporation of lndia Limited (PGCIL), a schedule'A'CPSE 06/11/2019 Powergrid (1.99 MB)
347 Re-constitution of the National Committee on Transmission" (NCT) 04/11/2019 Transmission (993.19 KB)
348 Constitution of five Regional Power Committees Transmission Planning RPCTPs 04/11/2019 Transmission (1.68 MB)
349 Filling up the post of Director (Projects), NTPC, a schedule 'A' CPSE 23/10/2019 Thermal I (2.34 MB)
350 Filling up the post of Member (Law), CERC 07/10/2019 R&R (4.89 MB)
351 Agenda Booklet for Conference of Power and Renewable Energy Ministers of the States/UTs to be held on 11-12th October 2019 in GUJARAT 07/10/2019 Coordination (10.96 MB)
352 Charging Infrastructure for Electric Vehicles - Revised Guidelines & Standards 01.10.2019 07/10/2019 Electric Vehicle (2.32 MB)
353 Clarification on Orders related to Renewable Purchase Obligation 07/10/2019 R&R (684.6 KB)
354 Minute to Minute Programme for Conference of Power and New & Renewable Energy Ministers of States & UTs On 11-12 October, 2019 04/10/2019 Coordination (527.88 KB)
355 Appointment to the post of Chairman, Bhakra Beas Management Board (BBMB) 04/10/2019 BBMB (2.11 MB)
356 Adequate Safeguards regarding para 2.1(b) of the approval of the Govt. on the recommendations of Group of Ministers (GoM) 03/09/2019 IPC (3.29 MB)
357 Selection for the post of Director (Electrical), in Satluj Jal Vidyut Nigam Ltd. 27/08/2019 Hydel II (321.25 KB)
358 Corrigendum to Mechanism w.r.t to Para 2.1(e) of the Govt. approval dated 08.03.2019 on the recommendations of GoM constituted to examine the specific recommendations of HLEC constituted to address the issues of Stressed TPPs 23/08/2019 IPC (2.87 MB)
359 Draft Methodology for allocation of coal as per provisions as Para B (viii) (a) of SHAKTI Policy of Ministry of Coal amended as per Para 2.1 (a) of HLEC Recommendations 21/08/2019 R&R (3.17 MB)
360 Methodology for Non-lapsing of short supplies of coal 20/08/2019 IPC (3.27 MB)

Pages