Ministry of Power Home Home
A A+ A- Facebook Twitter Instagram Skip to main content
  • English
  • हिन्दी

Search form

Home
  • About Us
    • Responsibilities
    • Organisational setup of Ministry
    • Organisations under MoP
    • Unit wise work Allocation in Ministry of Power
    • Channel of submission
    • Structure of Ministry
  • RTI
    • About RTI Act
    • Public Information Officers
    • Proactive Disclosures
    • Organisation - Work and Responsibilities
    • Upload RTI Online Application/Appeal
    • RTI MIS for CPIOs/ First Appellate Authorities
  • Tenders
  • Grievance
    • Complaint Committee under Sexual Harassment
  • Contact us
    • Hon'ble Minister of Power & Minister of State for Power
    • Head of Office/Section
    • All Ministry Officials
    • Attached offices/Autonomous bodies/PSUs/Research & Training Institute etc
    • Link Officer Arrangement
    • Nodal Officer (Website)
  • Screen Reader
Azadi ke Amrit Mahotsav Swach Bharat Abhiyan G20
  • Acts & Rules
    • Electricity Act, 2003
    • Energy Conservation Act, 2001
    • DVC Act 1948
    • Status
  • Generation
    • Overview
    • Power Sector at a Glance ALL INDIA
    • Generation Capacity
    • Capacity Addition Programme - XII Plan & Beyond
    • Generation Reports
    • Protection of Environment
    • ULTRA MEGA POWER PROJECTS
    • Renovation and Modernization
    • Power System
    • MoU with NHPC
  • Transmission
    • Overview
    • Creation of National Grid
    • Major Grid Substations of POWERGRID
    • Milestones
    • International Cooperation
    • National Electricity Plan II
    • Green Energy Corridor
    • GoI funded Schemes
    • CTU and STUs
    • Private Participation
    • Power Grid
    • MoUs with POWERGRID
    • Important Orders/ Guidelines/ Notifications/ Reports
    • Tenders for TBCB Transmission Projects
    • 500GW Nonfossil Fuel Target
  • Distribution
    • National Electricity Fund
    • MoUs Between MoP and PFC
    • National Smart Grid Mission(NSGM)
    • Integrated Power Development Scheme(IPDS)
    • DDUGJY
    • Saubhagya
  • Revamped Distribution Scheme
    • Overview
    • Office Memorandum
    • Guidelines
    • Standard Operating Procedure
    • Energy Accounting Guidelines
    • Integrated Rating of State Power Utilities
    • Performance Report of State Power Utilities
    • Ease of Doing Business - Getting Electricity
    • UDAY
    • Web-Portal Revamped Distribution Sector Scheme
  • Energy Conservation & Energy Transition
    • Overview
    • Rules/Regulations under Energy Conservation Act, 2001
    • Electric Vehicle
  • Research & Training
    • Training
    • Training Institutes
    • Research and Development
    • Research Institutes
  • Dashboards/Portals
    • Revamped Distribution Sector Scheme
    • National Power Portal
    • UDAY Dashboard
    • Vidyut Pravah
    • UJALA
    • Deep e-Bidding
    • TARANG
    • Saubhagya Dashboard
    • PRAAPTI
    • SAMARTH Portal
  • ETWG G20
    • About G20
    • Energy Transitions Working Group
    • PM Speech
    • G20 / ETWG Documents
    • Studies
    • Delegate Experience
    • Press Releases
    • G20 Gallery

Generation

  • Overview
  • Power Sector at a Glance ALL INDIA
  • Generation Capacity
  • Capacity Addition Programme - XII Plan & Beyond
  • Generation Reports
  • Protection of Environment
  • ULTRA MEGA POWER PROJECTS
  • Renovation and Modernization
  • Power System
  • MoU with NHPC
Home » Content » Power System

Power System

R& M OF SUBSTATION AND TRANSMISSION LINES:-

To cope up with growing demand for power, construction of new Transmission Lines and Sub-Stations is always a difficult proposition due to various factors like high initial investment, approvals, ROW and environmental concerns. R&M and upgradation of existing projects is one of the cost effective alternatives to increase the power transmission capabilities and reduce losses of a Transmission System. The transmission line and substation voltage upgrading offer considerable advantages. The conversion of transmission lines and substations to higher voltages has emerged as a viable alternative in meeting load growth or transmission requirements. This approach offers several advantages. In addition to the practical aspects such as use of available Right of Way (ROW) and substation site (i.e better utilisation of existing transmission system), the economic advantages may be of considerable interest, particularly if some of the original foundations, structure, or equipment can be used with minimal modifications. The economic advantage is also linked with reduction in losses

Page Updated On: 09/08/2021
  • Terms & Conditions
  • Web Information Manager
  • Citizen Charter
  • Copyright Policy
  • INTRANET
  • Website Policies
  • Feedback
  • Sitemap
  • HELP
  • Related Links

STQC Certification Badge

This website belongs to Ministry of Power Govt. of India, Shram Shakti Bhawan, Rafi Marg, New Delhi-1
Hosted by National Informatics Centre (NIC)

Last Updated on: 21 May 2025