Ministry of Power Home Home
A A+ A- Facebook Twitter Instagram Skip to main content
  • English
  • हिन्दी

Search form

Home
  • About Us
    • Responsibilities
    • Organisational setup of Ministry
    • Organisations under MoP
    • Unit wise work Allocation in Ministry of Power
    • Channel of submission
    • Structure of Ministry
  • RTI
    • About RTI Act
    • Public Information Officers
    • Proactive Disclosures
    • Organisation - Work and Responsibilities
    • Upload RTI Online Application/Appeal
    • RTI MIS for CPIOs/ First Appellate Authorities
  • Tenders
  • Grievance
    • Complaint Committee under Sexual Harassment
    • Public Grievance
  • Contact us
    • Hon'ble Minister of Power & Minister of State for Power
    • Head of Office/Section
    • All Ministry Officials
    • Chief controller of accounts
    • Attached offices/Autonomous bodies/PSUs/Research & Training Institute etc
    • Link Officer Arrangement
    • Nodal Officer (Website)
  • Screen Reader
Azadi ke Amrit Mahotsav Swach Bharat Abhiyan G20
  • Acts & Rules
    • Bidding Guidelines and Bidding Documents for procurement of Power
    • Electricity Act, 2003
    • Energy Conservation Act, 2001
    • DVC Act 1948
    • Status
  • Generation
    • Overview
    • Power Sector at a Glance ALL INDIA
    • Generation Capacity
    • Capacity Addition Programme - XII Plan & Beyond
    • Generation Reports
    • Protection of Environment
    • ULTRA MEGA POWER PROJECTS
    • Renovation and Modernization
    • Power System
    • MoU with NHPC
  • Transmission
    • Overview
    • Creation of National Grid
    • Major Grid Substations of POWERGRID
    • Milestones
    • International Cooperation
    • National Electricity Plan II
    • Green Energy Corridor
    • GoI funded Schemes
    • CTU and STUs
    • Private Participation
    • Power Grid
    • MoUs with POWERGRID
    • Important Orders/ Guidelines/ Notifications/ Reports
    • Tenders for TBCB Transmission Projects
    • 500GW Nonfossil Fuel Target
  • Distribution
    • National Electricity Fund
    • MoUs Between MoP and PFC
    • National Smart Grid Mission(NSGM)
    • Integrated Power Development Scheme(IPDS)
    • DDUGJY
    • Saubhagya
  • Revamped Distribution Scheme
    • Overview
    • Office Memorandum
    • Guidelines
    • Standard Operating Procedure
    • Energy Accounting Guidelines
    • Integrated Rating of State Power Utilities
    • Performance Report of State Power Utilities
    • Ease of Doing Business - Getting Electricity
    • UDAY
    • Web-Portal Revamped Distribution Sector Scheme
  • Energy Conservation & Energy Transition
    • Overview
    • Rules/Regulations under Energy Conservation Act, 2001
    • Electric Vehicle
  • Research & Training
    • Training
    • Training Institutes
    • Research and Development
    • Research Institutes
  • Dashboards/Portals
    • Revamped Distribution Sector Scheme
    • National Power Portal
    • NFMS Portal
    • Vidyut Pravah
    • UJALA
    • Deep e-Bidding
    • TARANG
    • Saubhagya Dashboard
    • PRAAPTI
    • SAMARTH Portal
  • ETWG G20
    • About G20
    • Energy Transitions Working Group
    • PM Speech
    • G20 / ETWG Documents
    • Studies
    • Delegate Experience
    • Press Releases
    • G20 Gallery
Home » circular
DD/MM/YYYY
Sr. No Subject Date Division Download / Link
1 Global Invitation for selection of Transmission Service Provider to establish Transmission system for the project namely “Transmission System for Proposed Green Hydrogen / Green Ammonia projects in Vizag area, Andhra Pradesh (Phase-I)” 25/02/2026 Transmission (7.2 MB)
2 Extension of the Timeline for Submission of Comments and Suggestions on Draft National Electricity Policy, 2026 25/02/2026 R&R (670.71 KB)
3 Publication of RFP document regarding initiation of the bid process for selection of TSP for Installation of 2 Nos. of Synchronous Condensers (SynCon) units at 765400220kV 17/02/2026 Transmission (5.6 MB)
4 Appointment to the post of Chairman, Bhakra Beas Management Board (BBMB)– regarding. 12/02/2026 BBMB (1.63 MB)
5 Amendments in the Supplementary Guidelines for payment of compensation in regard to Right of Way (ROW) for transmission lines issued by MoP on 21.03.2025 30/01/2026 Transmission (665.7 KB)
6 Revised guidelines for Coal and Lignite based Thermal Power Plants (TPPs) to utilize ash as stipulated in the MoEF&CC Notification dated 31.12.2021 and its subsequent amendments dated 30.12.2022 and 01.01.2024 30/01/2026 State Thermal (2.88 MB)
7 Selection for the post of Director (Operations), Power Grid Corporation of India Limited (PGCIL) 27/01/2026 Transmission (1.48 MB)
8 Seeking comments on Draft National Electricity Policy, 2026 – Reg. 21/01/2026 R&R (1.64 MB)
9 Amendments in the Supplementary Guidelines for payment of compensation in regard to Right of Way (ROW) for transmission lines issued by MoP on 21.03.2025 16/01/2026 Transmission (665.7 KB)
10 Seeking comments on Clause 8 of the JERC for the State of Goa and UTS (Salary, Allowances and other Conditions of Service of Chairperson and Member) Rules 2007 07/01/2026 R&R (489.1 KB)
11 Seeking comments on draft amendments proposed in Rule 3 (i.e, Requirements of Captive Generating Plant) of Electricity Rules, 2005 –reg 02/01/2026 R&R (5.82 MB)
12 Selection for the post of Director (Finance), Power Grid Corporation of India Limited (PGCIL) 29/12/2025 Powergrid (172.99 KB)
13 Constitution of Conciliation Committee of Independent Experts (CCIE) for resolution of contractual disputes in respect of the projects and scheme implemented by CPSUs / Statutory Bodies under administrative control of Ministry of Power 28/11/2025 Hydel II (6.66 MB)
14 Appointment to the post of Director (technical), Punatsangchhu -II Hydroelectric Project Authority (PHPA-II) in Bhutan -reg. 26/11/2025 BBMB (7.5 MB)
15 Vacancy Circular dated 12.11.2025 for the post of Member, JERC for Goa and UTs 12/11/2025 R&R (1.45 MB)
16 Extension of the Timeline for Submission of Comments on the Draft Electricity (Amendment) Bill, 2025-Reg 10/11/2025 R&R (652.04 KB)
17 Comprehensive Policy for Co-firing of Biomass pellets [including Torrefied Charcoal made from Municipal Solid Waste (MSW)] in Coal based Thermal Power Plants -reg 07/11/2025 Thermal I (1.64 MB)
18 Filling up of the post of Director General, National Power Training Institute (NPTI), Faridabad 06/11/2025 T&R (3.42 MB)
19 Selection for the post of Director (Personnel), NHPC Limited, a schedule 'A'CPSE 21/10/2025 NHPC (509.22 KB)
20 Selection for the post of Director (Finance), Power Finance Corporation Limited (PFC), a schedule 'A' CPSE. 14/10/2025 PFC (536.45 KB)
21 Selection for the post of Director (Projects), Power Finance Corporation Limited (PFC), a schedule 'A' CPSE. 14/10/2025 PFC
22 Seeking comments on Draft Electricity (Amendment) Bill, 2025 09/10/2025 Act & Notifications (2 MB)
23 Selection for the post of Director (Projects), SJVN Limited, a schedule 'A' CPSE- Advertisement reg. 03/10/2025 Hydel I (208.57 KB)
24 Subject Appointment to the post of Member (Renewable Energy) & Member (Economic & Commercial) in the Central Electricity Authority, on deputation/short-term contract basis – inviting applications for – regarding" 01/10/2025 Admin I (4.16 MB)
25 Revised Gazette Notification on Renewable Consumption Obligation (RCO) under the Energy Conservation Act, 2001, notified on 27th September 2025 01/10/2025 Admin I (2.05 MB)
26 Selection for the post of CMD, SJVN Limited, a schedule 'A' CPSE- Advertisement reg. 25/09/2025 PESB (1.54 MB)
27 Search-cum-Selection Committee for the appointment to the post of Technical Member for Electricity in the Appellate Tribunal for Electricity 24/09/2025 APTEL (384.13 KB)
28 Electricity (Amendment) Rules, 2025 23/09/2025 Act & Notifications (682.34 KB)
29 Seeking comments on draft amendments proposed in Rule 3 (i.e. Requirements of Captive Generating Plant) of Electricity Rules, 2025. (For the latest draft amendments, please refer to the draft issued on 2nd January, 2026) 23/09/2025 R&R (1.71 MB)
30 Dispute Avoidance Mechanism" through 'lndependent Engineer' (lE) in the Contract of CPSEs under administrative control of Ministry of Power Executing Hydro Power Projects - Panel of Experts 15/09/2025 Hydel II (1.04 MB)

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »
No Node Selected
  • Terms & Conditions
  • Web Information Manager
  • Citizen Charter
  • Copyright Policy
  • INTRANET
  • Website Policies
  • Feedback
  • Sitemap
  • HELP
  • Related Links

STQC Certification Badge

This website belongs to Ministry of Power Govt. of India, Shram Shakti Bhawan, Rafi Marg, New Delhi-1
Hosted by National Informatics Centre (NIC)

Last Updated on: 25 Feb 2026