Ministry of Power Home Home
A A+ A- Facebook Twitter Instagram Skip to main content
  • English
  • हिन्दी

Search form

Home
  • About Us
    • Responsibilities
    • Organisational setup of Ministry
    • Organisations under MoP
    • Unit wise work Allocation in Ministry of Power
    • Channel of submission
    • Structure of Ministry
  • RTI
    • About RTI Act
    • Public Information Officers
    • Proactive Disclosures
    • Organisation - Work and Responsibilities
    • Upload RTI Online Application/Appeal
    • RTI MIS for CPIOs/ First Appellate Authorities
  • Tenders
  • Grievance
    • Complaint Committee under Sexual Harassment
    • Public Grievance
  • Contact us
    • Hon'ble Minister of Power & Minister of State for Power
    • Head of Office/Section
    • All Ministry Officials
    • Chief controller of accounts
    • Attached offices/Autonomous bodies/PSUs/Research & Training Institute etc
    • Link Officer Arrangement
    • Nodal Officer (Website)
  • Screen Reader
Azadi ke Amrit Mahotsav Swach Bharat Abhiyan G20
  • Acts & Rules
    • Bidding Guidelines and Bidding Documents for procurement of Power
    • Electricity Act, 2003
    • Energy Conservation Act, 2001
    • DVC Act 1948
    • Status
  • Generation
    • Overview
    • Power Sector at a Glance ALL INDIA
    • Generation Capacity
    • Capacity Addition Programme - XII Plan & Beyond
    • Generation Reports
    • Protection of Environment
    • ULTRA MEGA POWER PROJECTS
    • Renovation and Modernization
    • Power System
    • MoU with NHPC
  • Transmission
    • Overview
    • Creation of National Grid
    • Major Grid Substations of POWERGRID
    • Milestones
    • International Cooperation
    • National Electricity Plan II
    • Green Energy Corridor
    • GoI funded Schemes
    • CTU and STUs
    • Private Participation
    • Power Grid
    • MoUs with POWERGRID
    • Important Orders/ Guidelines/ Notifications/ Reports
    • Tenders for TBCB Transmission Projects
    • 500GW Nonfossil Fuel Target
  • Distribution
    • National Electricity Fund
    • MoUs Between MoP and PFC
    • National Smart Grid Mission(NSGM)
    • Integrated Power Development Scheme(IPDS)
    • DDUGJY
    • Saubhagya
  • Revamped Distribution Scheme
    • Overview
    • Office Memorandum
    • Guidelines
    • Standard Operating Procedure
    • Energy Accounting Guidelines
    • Integrated Rating of State Power Utilities
    • Performance Report of State Power Utilities
    • Ease of Doing Business - Getting Electricity
    • UDAY
    • Web-Portal Revamped Distribution Sector Scheme
  • Energy Conservation & Energy Transition
    • Overview
    • Rules/Regulations under Energy Conservation Act, 2001
    • Electric Vehicle
  • Research & Training
    • Training
    • Training Institutes
    • Research and Development
    • Research Institutes
  • Dashboards/Portals
    • Revamped Distribution Sector Scheme
    • National Power Portal
    • NFMS Portal
    • Vidyut Pravah
    • UJALA
    • Deep e-Bidding
    • TARANG
    • Saubhagya Dashboard
    • PRAAPTI
    • SAMARTH Portal
  • ETWG G20
    • About G20
    • Energy Transitions Working Group
    • PM Speech
    • G20 / ETWG Documents
    • Studies
    • Delegate Experience
    • Press Releases
Home » circular
DD/MM/YYYY
Sr. No Subject Date Division Download / Link
1 Extension of timeline for submission of Renewable Consumption Obligation (RCO) Compliance details for FY 2024-25 up to 31.05.2026 16/04/2026 RCM (527.66 KB)
2 Joint Electricity Regulatory Commission for Union Territories except Delhi (Salary, Allowances and other Conditions of Service of Chairperson and Member) Amendment Rules, 2026 13/04/2026 R&R (416.77 KB)
3 Introduction of Insurance Surety Bonds (ISBS) as an Alternative to Bank Guarantee/Bid Security across all Power Procurement Frameworks 07/04/2026 R&R (877.53 KB)
4 Directions to Imported Coal-Based generating company under Section 11 of the Electricity Act, 2003 27/03/2026 R&R (56.78 KB)
5 Filling up one anticipated vacancy of Secretary in the Bureau of Energy Efficiency in Level- 13 of Pay Matrix on deputation basis-reg. 25/03/2026 EC (1.67 MB)
6 Electricity (Amendment) Rules, 2026 alongwith Explanatory Note 16/03/2026 R&R (891.34 KB)
7 Inviting applications for the post of Executive Director (ED) in REC Limited on deputation - extension of timeline for submission of applications - reg. 16/03/2026 RE (1.72 MB)
8 Seeking comments on Draft Electricity (Rights of Consumers) Amendment Rules, 2026 12/03/2026 R&R (5.12 MB)
9 Selection of Director (Finance), NTPC Limited, a schedule 'A' CPSE - regarding. 10/03/2026 PESB (1.83 MB)
10 Selection of Chairman & Managing Director, NTPC through ScSC - regarding. 28/02/2026 Thermal I (422.3 KB)
11 Extension of the Timeline for Submission of Comments and Suggestions on Draft National Electricity Policy, 2026 25/02/2026 R&R (670.71 KB)
12 Global Invitation for selection of Transmission Service Provider to establish Transmission system for the project namely “Transmission System for Proposed Green Hydrogen / Green Ammonia projects in Vizag area, Andhra Pradesh (Phase-I)” 19/02/2026 Transmission (7.2 MB)
13 Publication of RFP document regarding initiation of the bid process for selection of TSP for Installation of 2 Nos. of Synchronous Condensers (SynCon) units at 765400220kV 17/02/2026 Transmission (5.6 MB)
14 Appointment to the post of Chairman, Bhakra Beas Management Board (BBMB)– regarding. 12/02/2026 BBMB (1.63 MB)
15 Amendments in the Supplementary Guidelines for payment of compensation in regard to Right of Way (ROW) for transmission lines issued by MoP on 21.03.2025 30/01/2026 Transmission (665.7 KB)
16 Revised guidelines for Coal and Lignite based Thermal Power Plants (TPPs) to utilize ash as stipulated in the MoEF&CC Notification dated 31.12.2021 and its subsequent amendments dated 30.12.2022 and 01.01.2024 30/01/2026 State Thermal (2.88 MB)
17 Selection for the post of Director (Operations), Power Grid Corporation of India Limited (PGCIL) 27/01/2026 Transmission (1.48 MB)
18 Seeking comments on Draft National Electricity Policy, 2026 – Reg. 21/01/2026 R&R (1.64 MB)
19 Amendments in the Supplementary Guidelines for payment of compensation in regard to Right of Way (ROW) for transmission lines issued by MoP on 21.03.2025 16/01/2026 Transmission (665.7 KB)
20 Seeking comments on Clause 8 of the JERC for the State of Goa and UTS (Salary, Allowances and other Conditions of Service of Chairperson and Member) Rules 2007 07/01/2026 R&R (489.1 KB)
21 Seeking comments on draft amendments proposed in Rule 3 (i.e, Requirements of Captive Generating Plant) of Electricity Rules, 2005 –reg 02/01/2026 R&R (5.82 MB)
22 Selection for the post of Director (Finance), Power Grid Corporation of India Limited (PGCIL) 29/12/2025 Powergrid (172.99 KB)
23 Constitution of Conciliation Committee of Independent Experts (CCIE) for resolution of contractual disputes in respect of the projects and scheme implemented by CPSUs / Statutory Bodies under administrative control of Ministry of Power 28/11/2025 Hydel II (6.66 MB)
24 Appointment to the post of Director (technical), Punatsangchhu -II Hydroelectric Project Authority (PHPA-II) in Bhutan -reg. 26/11/2025 BBMB (7.5 MB)
25 Vacancy Circular dated 12.11.2025 for the post of Member, JERC for Goa and UTs 12/11/2025 R&R (1.45 MB)
26 Extension of the Timeline for Submission of Comments on the Draft Electricity (Amendment) Bill, 2025-Reg 10/11/2025 R&R (652.04 KB)
27 Comprehensive Policy for Co-firing of Biomass pellets [including Torrefied Charcoal made from Municipal Solid Waste (MSW)] in Coal based Thermal Power Plants -reg 07/11/2025 Thermal I (1.64 MB)
28 Filling up of the post of Director General, National Power Training Institute (NPTI), Faridabad 06/11/2025 T&R (3.42 MB)
29 Selection for the post of Director (Personnel), NHPC Limited, a schedule 'A'CPSE 21/10/2025 NHPC (509.22 KB)
30 Selection for the post of Director (Projects), Power Finance Corporation Limited (PFC), a schedule 'A' CPSE. 14/10/2025 PFC (517.56 KB)

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »
No Node Selected
  • Terms & Conditions
  • Web Information Manager
  • Citizen Charter
  • Copyright Policy
  • INTRANET
  • Website Policies
  • Feedback
  • Sitemap
  • HELP
  • Related Links

STQC Certification Badge

This website belongs to Ministry of Power Govt. of India, Shram Shakti Bhawan, Rafi Marg, New Delhi-1
Hosted by National Informatics Centre (NIC)

Last Updated on: 28 Apr 2026