DD/MM/YYYY
Sr. No Subject Date Division Download / Link
1 Request for comments on draft revised Guidelines on Electric Vehicle Charging Infrastructure for EVs prepared by Ministry of Power – reg 01/07/2024 EV (5.7 MB)
2 Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines - reg. 27/06/2024 FSC (2.81 MB)
3 Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision 20/06/2024 FSC (941.46 KB)
4 Guidelines for payment of compensation in regard to Right of way (RoW) for transmission lines 14/06/2024 Transmission (3.94 MB)
5 MoU 2023-24 signed between MoP and NHPC Limited 31/05/2024 NHPC (7.34 MB)
6 Vacancy Circular dated 22.05.2024 for the post of Member, JERC for UT of J&K and UT of Ladakh 22/05/2024 R&R (2.65 MB)
7 Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power Plants issued on O8.1O.2O21 - reg 14/05/2024 Thermal II (3.3 MB)
8 Selection for the post of Director (Finance), SJVN Limited, a schedule 'A' CPSE 02/05/2024 Hydel II (7.39 MB)
9 Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision 24/04/2024 FSC (5.15 MB)
10 Methodology for allocation of coal as per provisions of Para B(viii)(a) of SHAKTI Policy of Ministry of Coa 15/03/2024 IPC (4.28 MB)
11 Electricity (Third Amendment) Rules, 2024 14/03/2024 R&R (936.84 KB)
12 Vacancy Circular dated 13.03.2024 for the post of Member (Finance), Central Electricity Regulatory Commission 13/03/2024 R&R (4.88 MB)
13 Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines 04/03/2024 FSC (1.76 MB)
14 Report of the Committee Constituted by MoP to examine different modes of Contracting and restructure relevant provisions of contracts in Hydro Power Sector 29/02/2024 Hydel I (16 MB)
15 Electricity (Rights of Consumers) Amendment Rules, 2024 23/02/2024 R&R (1.03 MB)
16 Alignment with Open Access Regulations, on aggregation basis-reg. 19/02/2024 R&R (1.69 MB)
17 Seeking comments on draft Electricity (Third Amendment) Rules, 2024 16/02/2024 R&R (938.2 KB)
18 Selection for the post of CMD-SJVN Limited 09/02/2024 Hydel II (914.22 KB)
19 Selection for the post of Director (Operations), Power Grid Corporation of lndia Limited (PGCIL 09/02/2024 Powergrid (4.26 MB)
20 Electricity (Amendment) Rules, 2024 notified on 10th January, 2024 01/02/2024 R&R (465.67 KB)
21 Electricity (Second Amendment) Rules, 2024 notified on 17th January, 2024 01/02/2024 R&R (396.81 KB)
22 Appointment to the post of Excutive Director(ED) in REC Ltd. on deputation 05/01/2024 RE (499.93 KB)
23 Seeking comments on draft Electricity (Rights of Consumers) Second Amendment Rules, 2023 14/12/2023 R&R (1.82 MB)
24 Seeking comments on draft Electricity (Late Payment Surcharge and Related Matters) Amendment Rules, 2023 14/12/2023 R&R (1.65 MB)
25 Selection for the post of Director (Personnel), SJVN Limited, a schedule 'A' CPSE 08/12/2023 Hydel II (711.8 KB)
26 Selection for the post of Director(Projects) in NHPC Limited, a schedule "A" CPSE- reg. 05/12/2023 PESB (4.67 MB)
27 Selection for the post of Director (Finance), THDC India Limited, a schedule 'A' CPSE 05/12/2023 Hydel I (1.9 MB)
28 Vacancy Circular for selection of the post of Member, Central Electricity Regulatory Commission 13/11/2023 R&R (5.17 MB)
29 Price Benchmarking of Biomass Pellets for co-firing in Thermal Power Plants for Western Region 11/11/2023 Thermal II (795.76 KB)
30 Price Benchmarking of Biomass Pellets for co-firing in Thermal Power Plants for Northern Region (excluding NCR) 11/11/2023 Thermal II (786.85 KB)

Pages