|
241 |
Directions to generating companies under Section 11 of the Electricity Act, 2003 |
06/05/2022 |
R&R |
(1.29 MB) |
|
242 |
Dispute Resolution through Conciliation for Contractual Disputes in Projects implemented by CPSUs / Statutory Bodies under the administrative control of Ministry of Power - Induction of the coal-mining expert Member in the CCIE |
04/05/2022 |
Thermal II |
(4.83 MB) |
|
243 |
List of surrendered Power by various States-UTs |
02/05/2022 |
OM |
(6.5 MB) |
|
244 |
Vacancy circular for the post of Judicial Member dated 29th April 2022 |
29/04/2022 |
R&R |
(1.51 MB) |
|
245 |
Appointment to the post of Director General, Bureau of Energy Efficiency (BEE) |
28/04/2022 |
BEE |
(35.14 KB) |
|
246 |
Pre Bid Conference in ONLINE mode at "MICROSOFT TEAMS" Platform on Expression of Interest (EOI) for setting up a manufacturing zone on pilot basis for Power & Renewable Energy Sector- Implementation Frame Work |
25/04/2022 |
Thermal I |
(209.87 KB) |
|
247 |
Electricity (Rights of Consumers) Amendment Rules, 2022 |
22/04/2022 |
R&R |
(1.29 MB) |
|
248 |
Pre Bid conference on Expression of Interest (EOI) for setting up a manufacturing zone on pilot basis for Power & Renewable Energy Sector- Implementation Frame Work |
22/04/2022 |
Thermal I |
(379.48 KB) |
|
249 |
Scheme for Flexibility in Generation and Scheduling of Thermal Hydro Power Stations through bundling with Renewable Energy and Storage Power |
13/04/2022 |
RCM |
(1.76 MB) |
|
250 |
Seeking Expression of Interest (EoI) for setting up a manufacturing zone on pilot basis for Power & Renewable Energy Sector |
13/04/2022 |
Thermal I |
(1.42 MB) |
|
251 |
Hiring of Technical Professional in the Bureau of Energy Efficiency (BEE) on contract basis |
11/04/2022 |
EC |
(137.28 KB) |
|
252 |
Amendment to Mega Power Policy 2009 for Provisional Mega Power Projects |
08/04/2022 |
IPC |
(2.52 MB) |
|
253 |
Methodology for allocation of coal as per provisions of Para B(viii)(a) covering Para B(iii) of SHAKTI Policy of Ministry of Coal amended as per Para 2.1 (a) of HLEC Recommendations |
07/04/2022 |
IPC |
(2.48 MB) |
|
254 |
Clarification regarding Applicability of Revised Biomass Policy dated 8th October 2021 on Circulating Fluidized Bed Combustion Boilers (CFBC) |
07/04/2022 |
Thermal II |
(3.49 MB) |
|
255 |
Selection of the Transmission Service Provider for establishing transmission system for “Transmission system for evacuation of power from Chhatarpur SEZ (1500MW)” |
07/04/2022 |
Transmission |
(3.22 MB) |
|
256 |
Vacancy for the post of Director (Personnel), NHPC Limited |
31/03/2022 |
PESB |
(170.93 KB) |
|
257 |
Constitution of Conciliation Committee of Independent Experts for resolution of contractual disputes in respect of the projects implemented by CPSUs / Statutory Bodies under administrative control of Ministry of Power |
22/03/2022 |
Thermal II |
(4.51 MB) |
|
258 |
Bid process for Selection of the Transmission Service Provider for establishing transmission system for “400 kV Khandukhal (Srinagar) - Rampura (Kashipur) D/C Line” |
15/03/2022 |
Transmission |
(6.83 MB) |
|
259 |
Guidelines for Procurement and Utilization of Battery Energy Storage Systems as part of Generation, Transmission and Distribution assets, along with Ancillary Services |
11/03/2022 |
Transmission |
(1.81 MB) |
|
260 |
Guidelines on Planning of Communication System for lnter-State Transmission System (ISTS) |
09/03/2022 |
Transmission |
(1.04 MB) |
|
261 |
Bid process for selection of Transmission Service Provider (TSP) for establishing “Transmission system for evacuation of power from REZ in Rajasthan(20GW) under Phase-III Part H” - Regarding issuance of RfP |
08/03/2022 |
Transmission |
(4.82 MB) |
|
262 |
Setting up Power Foundation |
08/03/2022 |
EC |
(794.95 KB) |
|
263 |
Model contract for use of Biomass in Thermal Power Plants (TPPs) |
03/03/2022 |
Thermal II |
(828.4 KB) |
|
264 |
Advisory to Thermal Power Plants on supply of ash generated by them to the prospective user agencies as stipulated in the MoEF&CC Notification dated 31.12.2021 to increase Ash utilization |
24/02/2022 |
State Thermal |
(3.93 MB) |
|
265 |
Clarification on Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021 |
23/02/2022 |
R&R |
(636.07 KB) |
|
266 |
Amendments to the Guidelines for Short-Term Procurement of Power (i.e. for a period of more than one day to one year) by Distribution Licensees through Tariff based bidding process |
23/02/2022 |
R&R |
(1.36 MB) |
|
267 |
Appointment to the post of Member Thermal in the Central Electricity Authority on deputation short-term/contract basis |
21/02/2022 |
Admin I |
(7.82 MB) |
|
268 |
Green Hydrogen Policy |
17/02/2022 |
R&R |
(1.16 MB) |
|
269 |
Initiation of bidding process for 2 newly allocated ISTS TBCB projects |
17/02/2022 |
Transmission |
(8.08 MB) |
|
270 |
Transmission system for evacuation of power from REZ in Rajasthan (20 GW) under phase III –Part A1" allocated to PFCCL to act as BPC to be implemented through TBCB mode |
11/02/2022 |
Transmission |
(5.17 MB) |