1 |
Selection for the post of Director (Projects), REC Ltd. a schedule A, CPSE |
24/12/2024 |
PESB |
(4.43 MB) |
2 |
Request for comments on amendment in draft Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 — reg |
28/11/2024 |
EV |
(18.76 MB) |
3 |
Vacancy Circular dated 28.11.2024 for the post of Chairperson, JERC for UT of J&K and UT of Ladakh |
28/11/2024 |
R&R |
(3.07 MB) |
4 |
Extension of timeline for submission of the comments - Amendments to the Guidelines for TBCB for procurement of power from Grid Connected power projects |
12/11/2024 |
NRE |
(667.42 KB) |
5 |
Workforce Adequacy Guidelines for Load Despatch Centres and Guidelines for deputation of Workforce from SLDCs to Grid-India for fixed terms |
08/11/2024 |
OM |
(7.49 MB) |
6 |
Seeking comments on Amendment to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid connected Power Projects |
28/10/2024 |
NRE |
(476.2 KB) |
7 |
Seeking comments on draft Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2024 |
26/10/2024 |
R&R |
(1.01 MB) |
8 |
Selection for the post of CMD, NTPC Ltd - reg. |
25/10/2024 |
Thermal I |
(1.63 MB) |
9 |
Filling up of the post of Director General, Central Power Research Institute (CPRI), Bangalore in Level-l5 of 7th CPC (Rs.182200-Rs.224100 in the Pay Matrix on direct recruitment deputation basis |
22/10/2024 |
T&R |
(6.27 MB) |
10 |
Selection for the post of Director(Technical, NHPC Limited, a schedule 'A' CPSE. |
18/10/2024 |
PESB |
(2.05 MB) |
11 |
Schemes of Central Financial Assistance (CFA) towards equity participation by the State Governments for the development of Hydro Electric Projects in the North Eastern Region. |
08/10/2024 |
Hydel I |
(1.69 MB) |
12 |
Draft Guidelines for Installation and Operation of Battery Swapping and Charging Stations |
04/10/2024 |
EV |
(628.6 KB) |
13 |
Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 |
18/09/2024 |
EV |
(18.14 MB) |
14 |
Request for comments on draft Recruitment Rules for the post of Despatch Rider |
18/09/2024 |
Admin I |
(774.04 KB) |
15 |
Amendment in the Guideline for Import/ Export (Cross Border) of Electricity, 2018 |
12/08/2024 |
Transmission |
(982.86 KB) |
16 |
Request for comments on draft revised Guidelines on Electric Vehicle Charging Infrastructure for EVs prepared by Ministry of Power – reg |
01/07/2024 |
EV |
(5.7 MB) |
17 |
Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines - reg. |
27/06/2024 |
FSC |
(2.81 MB) |
18 |
Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision |
20/06/2024 |
FSC |
(941.46 KB) |
19 |
Guidelines for payment of compensation in regard to Right of way (RoW) for transmission lines |
14/06/2024 |
Transmission |
(3.94 MB) |
20 |
MoU 2023-24 signed between MoP and NHPC Limited |
31/05/2024 |
NHPC |
(7.34 MB) |
21 |
Vacancy Circular dated 22.05.2024 for the post of Member, JERC for UT of J&K and UT of Ladakh |
22/05/2024 |
R&R |
(2.65 MB) |
22 |
Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power Plants issued on O8.1O.2O21 - reg |
14/05/2024 |
Thermal II |
(3.3 MB) |
23 |
Selection for the post of Director (Finance), SJVN Limited, a schedule 'A' CPSE |
02/05/2024 |
Hydel II |
(7.39 MB) |
24 |
Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision |
24/04/2024 |
FSC |
(5.15 MB) |
25 |
Methodology for allocation of coal as per provisions of Para B(viii)(a) of SHAKTI Policy of Ministry of Coa |
15/03/2024 |
IPC |
(4.28 MB) |
26 |
Electricity (Third Amendment) Rules, 2024 |
14/03/2024 |
R&R |
(936.84 KB) |
27 |
Vacancy Circular dated 13.03.2024 for the post of Member (Finance), Central Electricity Regulatory Commission |
13/03/2024 |
R&R |
(4.88 MB) |
28 |
Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines |
04/03/2024 |
FSC |
(1.76 MB) |
29 |
Report of the Committee Constituted by MoP to examine different modes of Contracting and restructure relevant provisions of contracts in Hydro Power Sector |
29/02/2024 |
Hydel I |
(16 MB) |
30 |
Electricity (Rights of Consumers) Amendment Rules, 2024 |
23/02/2024 |
R&R |
(1.03 MB) |