Sr. No | Subject | Date | Division | Download / Link |
---|---|---|---|---|
1 | Extension of timeline for submission of the comments - Amendments to the Guidelines for TBCB for procurement of power from Grid Connected power projects | 12/11/2024 | NRE | (667.42 KB) |
2 | Workforce Adequacy Guidelines for Load Despatch Centres and Guidelines for deputation of Workforce from SLDCs to Grid-India for fixed terms | 08/11/2024 | OM | (7.49 MB) |
3 | Seeking comments on Amendment to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid connected Power Projects | 28/10/2024 | NRE | (476.2 KB) |
4 | Selection for the post of CMD, NTPC Ltd - reg. | 25/10/2024 | Thermal I | (1.63 MB) |
5 | Filling up of the post of Director General, Central Power Research Institute (CPRI), Bangalore in Level-l5 of 7th CPC (Rs.182200-Rs.224100 in the Pay Matrix on direct recruitment deputation basis | 22/10/2024 | T&R | (6.27 MB) |
6 | Selection for the post of Director(Technical, NHPC Limited, a schedule 'A' CPSE. | 18/10/2024 | PESB | (2.05 MB) |
7 | Modification of the scheme of Budgetary Support for the cost of enabling Infrastructure for Hydro Electric Projects | 08/10/2024 | Hydel I | (1.21 MB) |
8 | Schemes of Central Financial Assistance (CFA) towards equity participation by the State Governments for the development of Hydro Electric Projects in the North Eastern Region. | 08/10/2024 | Hydel I | (1.69 MB) |
9 | Draft Guidelines for Installation and Operation of Battery Swapping and Charging Stations | 04/10/2024 | EV | (628.6 KB) |
10 | Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 | 18/09/2024 | EV | (18.14 MB) |
11 | Request for comments on draft Recruitment Rules for the post of Despatch Rider | 18/09/2024 | Admin I | (774.04 KB) |
12 | Amendment in the Guideline for Import/ Export (Cross Border) of Electricity, 2018 | 12/08/2024 | Transmission | (982.86 KB) |
13 | Request for comments on draft revised Guidelines on Electric Vehicle Charging Infrastructure for EVs prepared by Ministry of Power – reg | 01/07/2024 | EV | (5.7 MB) |
14 | Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines - reg. | 27/06/2024 | FSC | (2.81 MB) |
15 | Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision | 20/06/2024 | FSC | (941.46 KB) |
16 | Guidelines for payment of compensation in regard to Right of way (RoW) for transmission lines | 14/06/2024 | Transmission | (3.94 MB) |
17 | MoU 2023-24 signed between MoP and NHPC Limited | 31/05/2024 | NHPC | (7.34 MB) |
18 | Vacancy Circular dated 22.05.2024 for the post of Member, JERC for UT of J&K and UT of Ladakh | 22/05/2024 | R&R | (2.65 MB) |
19 | Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power Plants issued on O8.1O.2O21 - reg | 14/05/2024 | Thermal II | (3.3 MB) |
20 | Selection for the post of Director (Finance), SJVN Limited, a schedule 'A' CPSE | 02/05/2024 | Hydel II | (7.39 MB) |
21 | Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision | 24/04/2024 | FSC | (5.15 MB) |
22 | Methodology for allocation of coal as per provisions of Para B(viii)(a) of SHAKTI Policy of Ministry of Coa | 15/03/2024 | IPC | (4.28 MB) |
23 | Electricity (Third Amendment) Rules, 2024 | 14/03/2024 | R&R | (936.84 KB) |
24 | Vacancy Circular dated 13.03.2024 for the post of Member (Finance), Central Electricity Regulatory Commission | 13/03/2024 | R&R | (4.88 MB) |
25 | Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines | 04/03/2024 | FSC | (1.76 MB) |
26 | Report of the Committee Constituted by MoP to examine different modes of Contracting and restructure relevant provisions of contracts in Hydro Power Sector | 29/02/2024 | Hydel I | (16 MB) |
27 | Electricity (Rights of Consumers) Amendment Rules, 2024 | 23/02/2024 | R&R | (1.03 MB) |
28 | Alignment with Open Access Regulations, on aggregation basis-reg. | 19/02/2024 | R&R | (1.69 MB) |
29 | Seeking comments on draft Electricity (Third Amendment) Rules, 2024 | 16/02/2024 | R&R | (938.2 KB) |
30 | Selection for the post of CMD-SJVN Limited | 09/02/2024 | Hydel II | (914.22 KB) |
*