Sr. No | Subject | Date | Division | Download / Link |
---|---|---|---|---|
1 | Request for comments on draft revised Guidelines on Electric Vehicle Charging Infrastructure for EVs prepared by Ministry of Power – reg | 01/07/2024 | EV | (5.7 MB) |
2 | Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines - reg. | 27/06/2024 | FSC | (2.81 MB) |
3 | Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision | 20/06/2024 | FSC | (941.46 KB) |
4 | Guidelines for payment of compensation in regard to Right of way (RoW) for transmission lines | 14/06/2024 | Transmission | (3.94 MB) |
5 | MoU 2023-24 signed between MoP and NHPC Limited | 31/05/2024 | NHPC | (7.34 MB) |
6 | Vacancy Circular dated 22.05.2024 for the post of Member, JERC for UT of J&K and UT of Ladakh | 22/05/2024 | R&R | (2.65 MB) |
7 | Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power Plants issued on O8.1O.2O21 - reg | 14/05/2024 | Thermal II | (3.3 MB) |
8 | Selection for the post of Director (Finance), SJVN Limited, a schedule 'A' CPSE | 02/05/2024 | Hydel II | (7.39 MB) |
9 | Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision | 24/04/2024 | FSC | (5.15 MB) |
10 | Methodology for allocation of coal as per provisions of Para B(viii)(a) of SHAKTI Policy of Ministry of Coa | 15/03/2024 | IPC | (4.28 MB) |
11 | Electricity (Third Amendment) Rules, 2024 | 14/03/2024 | R&R | (936.84 KB) |
12 | Vacancy Circular dated 13.03.2024 for the post of Member (Finance), Central Electricity Regulatory Commission | 13/03/2024 | R&R | (4.88 MB) |
13 | Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines | 04/03/2024 | FSC | (1.76 MB) |
14 | Report of the Committee Constituted by MoP to examine different modes of Contracting and restructure relevant provisions of contracts in Hydro Power Sector | 29/02/2024 | Hydel I | (16 MB) |
15 | Electricity (Rights of Consumers) Amendment Rules, 2024 | 23/02/2024 | R&R | (1.03 MB) |
16 | Alignment with Open Access Regulations, on aggregation basis-reg. | 19/02/2024 | R&R | (1.69 MB) |
17 | Seeking comments on draft Electricity (Third Amendment) Rules, 2024 | 16/02/2024 | R&R | (938.2 KB) |
18 | Selection for the post of CMD-SJVN Limited | 09/02/2024 | Hydel II | (914.22 KB) |
19 | Selection for the post of Director (Operations), Power Grid Corporation of lndia Limited (PGCIL | 09/02/2024 | Powergrid | (4.26 MB) |
20 | Electricity (Second Amendment) Rules, 2024 notified on 17th January, 2024 | 01/02/2024 | R&R | (396.81 KB) |
21 | Electricity (Amendment) Rules, 2024 notified on 10th January, 2024 | 01/02/2024 | R&R | (465.67 KB) |
22 | Appointment to the post of Excutive Director(ED) in REC Ltd. on deputation | 05/01/2024 | RE | (499.93 KB) |
23 | Seeking comments on draft Electricity (Late Payment Surcharge and Related Matters) Amendment Rules, 2023 | 14/12/2023 | R&R | (1.65 MB) |
24 | Seeking comments on draft Electricity (Rights of Consumers) Second Amendment Rules, 2023 | 14/12/2023 | R&R | (1.82 MB) |
25 | Selection for the post of Director (Personnel), SJVN Limited, a schedule 'A' CPSE | 08/12/2023 | Hydel II | (711.8 KB) |
26 | Selection for the post of Director(Projects) in NHPC Limited, a schedule "A" CPSE- reg. | 05/12/2023 | PESB | (4.67 MB) |
27 | Selection for the post of Director (Finance), THDC India Limited, a schedule 'A' CPSE | 05/12/2023 | Hydel I | (1.9 MB) |
28 | Vacancy Circular for selection of the post of Member, Central Electricity Regulatory Commission | 13/11/2023 | R&R | (5.17 MB) |
29 | Price Benchmarking of Biomass Pellets for co-firing in Thermal Power Plants for Western Region | 11/11/2023 | Thermal II | (795.76 KB) |
30 | Price Benchmarking of Biomass Pellets for co-firing in Thermal Power Plants for Northern Region (excluding NCR) | 11/11/2023 | Thermal II | (786.85 KB) |
*