Ministry of Power Home Home
A A+ A- Facebook Twitter Instagram Skip to main content
  • English
  • हिन्दी

Search form

Home
  • About Us
    • Responsibilities
    • Organisational setup of Ministry
    • Organisations under MoP
    • Unit wise work Allocation in Ministry of Power
    • Channel of submission
    • Structure of Ministry
  • RTI
    • About RTI Act
    • Public Information Officers
    • Proactive Disclosures
    • Organisation - Work and Responsibilities
    • Upload RTI Online Application/Appeal
    • RTI MIS for CPIOs/ First Appellate Authorities
  • Tenders
  • Grievance
    • Complaint Committee under Sexual Harassment
  • Contact us
    • Hon'ble Minister of Power & Minister of State for Power
    • Head of Office/Section
    • All Ministry Officials
    • Attached offices/Autonomous bodies/PSUs/Research & Training Institute etc
    • Link Officer Arrangement
    • Nodal Officer (Website)
  • Screen Reader
Azadi ke Amrit Mahotsav Swach Bharat Abhiyan G20
  • Acts & Rules
    • Electricity Act, 2003
    • Energy Conservation Act, 2001
    • DVC Act 1948
    • Status
  • Generation
    • Overview
    • Power Sector at a Glance ALL INDIA
    • Generation Capacity
    • Capacity Addition Programme - XII Plan & Beyond
    • Generation Reports
    • Protection of Environment
    • ULTRA MEGA POWER PROJECTS
    • Renovation and Modernization
    • Power System
    • MoU with NHPC
  • Transmission
    • Overview
    • Creation of National Grid
    • Major Grid Substations of POWERGRID
    • Milestones
    • International Cooperation
    • National Electricity Plan II
    • Green Energy Corridor
    • GoI funded Schemes
    • CTU and STUs
    • Private Participation
    • Power Grid
    • MoUs with POWERGRID
    • Important Orders/ Guidelines/ Notifications/ Reports
    • Tenders for TBCB Transmission Projects
    • 500GW Nonfossil Fuel Target
  • Distribution
    • National Electricity Fund
    • MoUs Between MoP and PFC
    • National Smart Grid Mission(NSGM)
    • Integrated Power Development Scheme(IPDS)
    • DDUGJY
    • Saubhagya
  • Revamped Distribution Scheme
    • Overview
    • Office Memorandum
    • Guidelines
    • Standard Operating Procedure
    • Energy Accounting Guidelines
    • Integrated Rating of State Power Utilities
    • Performance Report of State Power Utilities
    • Ease of Doing Business - Getting Electricity
    • UDAY
    • Web-Portal Revamped Distribution Sector Scheme
  • Energy Conservation & Energy Transition
    • Overview
    • Rules/Regulations under Energy Conservation Act, 2001
    • Electric Vehicle
  • Research & Training
    • Training
    • Training Institutes
    • Research and Development
    • Research Institutes
  • Dashboards/Portals
    • Revamped Distribution Sector Scheme
    • National Power Portal
    • UDAY Dashboard
    • Vidyut Pravah
    • UJALA
    • Deep e-Bidding
    • TARANG
    • Saubhagya Dashboard
    • PRAAPTI
    • SAMARTH Portal
  • ETWG G20
    • About G20
    • Energy Transitions Working Group
    • PM Speech
    • G20 / ETWG Documents
    • Studies
    • Delegate Experience
    • Press Releases
    • G20 Gallery
Home » circular
DD/MM/YYYY
Sr. No Subject Date Division Download / Link
1 Sexual Harassment Internal Complaint Committee 19/02/2025 Admin II (391.58 KB)
2 Amendment in the composition of the "National Committee on Transmission" (NCT) - reg. 18/02/2025 Transmission (783.21 KB)
3 Draft Guidelines for designating a company as Renewable Energy Implementing Agency (REIA) – reg. 11/02/2025 NRE (304.1 KB)
4 Appointment to the post of Managing Director, Punatsangchhu –II Hydroelectric Project Authority (PHPA-II) in Bhutan – reg. 11/02/2025 BBMB (1.24 MB)
5 Guidelines for Installation and Operation of Battery Swapping and Charging Stations — reg 11/01/2025 EV (1.03 MB)
6 Selection for the post of Director (Projects), REC Ltd. a schedule A, CPSE 24/12/2024 PESB (4.43 MB)
7 Request for comments on amendment in draft Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 — reg 28/11/2024 EV (18.76 MB)
8 Vacancy Circular dated 28.11.2024 for the post of Chairperson, JERC for UT of J&K and UT of Ladakh 28/11/2024 R&R (3.07 MB)
9 Extension of timeline for submission of the comments - Amendments to the Guidelines for TBCB for procurement of power from Grid Connected power projects 12/11/2024 NRE (667.42 KB)
10 Workforce Adequacy Guidelines for Load Despatch Centres and Guidelines for deputation of Workforce from SLDCs to Grid-India for fixed terms 08/11/2024 OM (7.49 MB)
11 Seeking comments on Amendment to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid connected Power Projects 28/10/2024 NRE (476.2 KB)
12 Seeking comments on draft Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2024 26/10/2024 R&R (1.01 MB)
13 Selection for the post of CMD, NTPC Ltd - reg. 25/10/2024 Thermal I (1.63 MB)
14 Filling up of the post of Director General, Central Power Research Institute (CPRI), Bangalore in Level-l5 of 7th CPC (Rs.182200-Rs.224100 in the Pay Matrix on direct recruitment deputation basis 22/10/2024 T&R (6.27 MB)
15 Selection for the post of Director(Technical, NHPC Limited, a schedule 'A' CPSE. 18/10/2024 PESB (2.05 MB)
16 Schemes of Central Financial Assistance (CFA) towards equity participation by the State Governments for the development of Hydro Electric Projects in the North Eastern Region. 08/10/2024 Hydel I (1.69 MB)
17 Draft Guidelines for Installation and Operation of Battery Swapping and Charging Stations 04/10/2024 EV (628.6 KB)
18 Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 18/09/2024 EV (18.14 MB)
19 Request for comments on draft Recruitment Rules for the post of Despatch Rider 18/09/2024 Admin I (774.04 KB)
20 Amendment in the Guideline for Import/ Export (Cross Border) of Electricity, 2018 12/08/2024 Transmission (982.86 KB)
21 Request for comments on draft revised Guidelines on Electric Vehicle Charging Infrastructure for EVs prepared by Ministry of Power – reg 01/07/2024 EV (5.7 MB)
22 Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines - reg. 27/06/2024 FSC (2.81 MB)
23 Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision 20/06/2024 FSC (941.46 KB)
24 Guidelines for payment of compensation in regard to Right of way (RoW) for transmission lines 14/06/2024 Transmission (3.94 MB)
25 MoU 2023-24 signed between MoP and NHPC Limited 31/05/2024 NHPC (7.34 MB)
26 Vacancy Circular dated 22.05.2024 for the post of Member, JERC for UT of J&K and UT of Ladakh 22/05/2024 R&R (2.65 MB)
27 Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power Plants issued on O8.1O.2O21 - reg 14/05/2024 Thermal II (3.3 MB)
28 Selection for the post of Director (Finance), SJVN Limited, a schedule 'A' CPSE 02/05/2024 Hydel II (7.39 MB)
29 Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision 24/04/2024 FSC (5.15 MB)
30 Methodology for allocation of coal as per provisions of Para B(viii)(a) of SHAKTI Policy of Ministry of Coa 15/03/2024 IPC (4.28 MB)

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »
No Node Selected
  • Terms & Conditions
  • Web Information Manager
  • Citizen Charter
  • Copyright Policy
  • INTRANET
  • Website Policies
  • Feedback
  • Sitemap
  • HELP
  • Related Links

STQC Certification Badge

This website belongs to Ministry of Power Govt. of India, Shram Shakti Bhawan, Rafi Marg, New Delhi-1
Hosted by National Informatics Centre (NIC)

Last Updated on: 08 May 2025