|
31 |
Global Invitation for selection of Transmission Service Provider to establish Transmission system for the project “Inter Regional strengthening between SR Grid and WR Grid” |
25/06/2025 |
NRE |
(2.82 MB) |
|
32 |
Global Invitation for selection of Transmission Service Provider to establish Transmission system for the project “Inter Regional strengthening between SR Grid and WR Grid” |
21/06/2025 |
RE |
(5.99 MB) |
|
33 |
Amendment in Standard Bidding Documents for procurement of Inter-State Transmission Services through Tariff Based Competitive Bidding (TBCB) process |
20/06/2025 |
Transmission |
(6.83 MB) |
|
34 |
Vacancy Circular dated 11.06.2025 for the post of Member, JERC for UT of J&K and UT of Ladakh |
11/06/2025 |
R&R |
(2.8 MB) |
|
35 |
Viability Gap Funding (VGF) Scheme for development of Battery Energy Storage Systems (BESS) supported through Power System Development Fund (PSDF) |
09/06/2025 |
NRE |
(2.6 MB) |
|
36 |
Extension of timeline for submission of comments-Draft amendments proposed in the Model Bidding Documents (MBDs) for Procurement of Power for Long Term from Thermal Power Stations set up on Design, Build, Finance, Own, and Operate (DBFOO) basis-Reg |
19/05/2025 |
R&R |
(2.92 MB) |
|
37 |
Selection for the post of Chairman & Managing Director (CMD), Power Grid Corporation of India Limited (POWERGRID) |
16/05/2025 |
Powergrid |
(192.22 KB) |
|
38 |
Invitation of Expression of Interest (Eol) for empanelment of Independent Experts for constitution of Conciliation Committees for dispute resolution |
02/05/2025 |
Hydel II |
(6.72 MB) |
|
39 |
Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2025-reg. |
02/05/2025 |
R&R |
(1.13 MB) |
|
40 |
Amendment in the composition of the "National Committee on Transmission" (NCT) - reg. |
17/04/2025 |
Transmission |
(783.21 KB) |
|
41 |
Clarification regarding capping of RPO/RCO in view of Notification no. 30/04/2018-R&R dated 1st October 2019 issued by Ministry of Power. |
16/04/2025 |
RCM |
(1.33 MB) |
|
42 |
Sexual Harassment Internal Complaint Committee |
19/02/2025 |
Admin II |
(391.58 KB) |
|
43 |
Amendment in the composition of the "National Committee on Transmission" (NCT) - reg. |
18/02/2025 |
Transmission |
(783.21 KB) |
|
44 |
Appointment to the post of Managing Director, Punatsangchhu –II Hydroelectric Project Authority (PHPA-II) in Bhutan – reg. |
11/02/2025 |
BBMB |
(1.24 MB) |
|
45 |
Draft Guidelines for designating a company as Renewable Energy Implementing Agency (REIA) – reg. |
11/02/2025 |
NRE |
(304.1 KB) |
|
46 |
Guidelines for Installation and Operation of Battery Swapping and Charging Stations — reg |
11/01/2025 |
EV |
(1.03 MB) |
|
47 |
Selection for the post of Director (Projects), REC Ltd. a schedule A, CPSE |
24/12/2024 |
PESB |
(4.43 MB) |
|
48 |
Request for comments on amendment in draft Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 — reg |
28/11/2024 |
EV |
(18.76 MB) |
|
49 |
Vacancy Circular dated 28.11.2024 for the post of Chairperson, JERC for UT of J&K and UT of Ladakh |
28/11/2024 |
R&R |
(3.07 MB) |
|
50 |
Extension of timeline for submission of the comments - Amendments to the Guidelines for TBCB for procurement of power from Grid Connected power projects |
12/11/2024 |
NRE |
(667.42 KB) |
|
51 |
Workforce Adequacy Guidelines for Load Despatch Centres and Guidelines for deputation of Workforce from SLDCs to Grid-India for fixed terms |
08/11/2024 |
OM |
(7.49 MB) |
|
52 |
Seeking comments on Amendment to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid connected Power Projects |
28/10/2024 |
NRE |
(476.2 KB) |
|
53 |
Seeking comments on draft Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2024 |
26/10/2024 |
R&R |
(1.01 MB) |
|
54 |
Selection for the post of CMD, NTPC Ltd - reg. |
25/10/2024 |
Thermal I |
(1.63 MB) |
|
55 |
Filling up of the post of Director General, Central Power Research Institute (CPRI), Bangalore in Level-l5 of 7th CPC (Rs.182200-Rs.224100 in the Pay Matrix on direct recruitment deputation basis |
22/10/2024 |
T&R |
(6.27 MB) |
|
56 |
Selection for the post of Director(Technical, NHPC Limited, a schedule 'A' CPSE. |
18/10/2024 |
PESB |
(2.05 MB) |
|
57 |
Schemes of Central Financial Assistance (CFA) towards equity participation by the State Governments for the development of Hydro Electric Projects in the North Eastern Region. |
08/10/2024 |
Hydel I |
(1.69 MB) |
|
58 |
Draft Guidelines for Installation and Operation of Battery Swapping and Charging Stations |
04/10/2024 |
EV |
(628.6 KB) |
|
59 |
Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 |
18/09/2024 |
EV |
(18.14 MB) |
|
60 |
Request for comments on draft Recruitment Rules for the post of Despatch Rider |
18/09/2024 |
Admin I |
(774.04 KB) |