61 |
Selection for the post of Director (Market Operation), Grid Controller of India Limited (Grid-India), 'A' CPSE. |
04/10/2023 |
OM |
(4.04 MB) |
62 |
Appointment to the post of Member (Hydro) in the Central Electricity Authority, on deputation/short-term contract basis - inviting applications for - regarding |
03/10/2023 |
Admin I |
(2.18 MB) |
63 |
Withdrawal of the Guidelines dated 22nd March 2021 and 5th July 2021 regarding the Discoms continuing with Drawing power after completion of the term of the PPA |
12/09/2023 |
RCM |
(9.24 MB) |
64 |
Appointment to the post of Executive Director (ED) in REC Ltd. on deputation |
06/09/2023 |
RE |
(1.64 MB) |
65 |
Proposal for amendment of Bureau of Energy Efficiency (BEE's) Recruitment Rules notified vide G.S.R. 1125(E) dated 31.08.2017 |
05/09/2023 |
EC |
(4.96 MB) |
66 |
Draft Electricity Distribution (Accounting aspects of Specified Items & Additional Disclosure) Rules, 2023 reg |
04/09/2023 |
Act & Notifications |
(2.73 MB) |
67 |
Direction to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines |
02/09/2023 |
FSC |
(875.68 KB) |
68 |
Draft Electricity Distribution (Accounting aspects of Specified Items & Additional Disclosure) Rules, 2023 reg |
02/09/2023 |
Distribution |
(1.45 MB) |
69 |
National Framework for promoting Energy Storage Systems - August 2023 |
01/09/2023 |
NRE |
(205.15 KB) |
70 |
Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Projects dated 21.08.2023 |
21/08/2023 |
Powergrid |
(1007.96 KB) |
71 |
Appointment of Smt. Parminder Chopra, Director (Finance), PFC Ltd. to the post of CMD, PFC quirement w.r.t. HVDC system) |
14/08/2023 |
PFC |
(318.31 KB) |
72 |
Amendment in the SBDs for procurement of Inter-State Transmission Services through Tariff Based Competitive Bidding (TBCB) process (Technical Qualification Requirement w.r.t. HVDC system) |
09/08/2023 |
Transmission |
(1.26 MB) |
73 |
Selection for the post of Chairman & Managing Director, North Eastern Electric Power Corporation Limited (NEEPCO), a schedule 'A' CPSE |
08/08/2023 |
Hydel I |
(2.41 MB) |
74 |
Appointment to the post of Director(Technical), Punatsangchhu-I Hydroelectric Project Authority(PHPA-I) in Bhutan |
31/07/2023 |
BBMB |
(843.53 KB) |
75 |
Engagement of retired Governments servants as Consultants in the Bureau of Energy Efficiency on contract basis |
31/07/2023 |
BEE |
(7.21 MB) |
76 |
Electricity (Second Amendment) Rules, 2023 |
31/07/2023 |
R&R |
(627.77 KB) |
77 |
Strict compliance of the provisions of Flag Code of India, 2002 [as amended in 2021 & 2022] and the Prevention of Insults to National Honour Act, 1971 |
28/07/2023 |
Coordination |
(3.4 MB) |
78 |
Appointment to the post of Executive Director (ED) in REC Limited on deputation |
27/07/2023 |
RE |
(607.06 KB) |
79 |
Electricity (Amendment) Rules, 2023 |
14/07/2023 |
R&R |
(4.77 MB) |
80 |
RFP notification and RFP Documents for Selection of the Transmission Service Provider for establishing transmission system for “Eastern Region Expansion Scheme-XXXIV (ERES-XXXIV)” |
10/07/2023 |
Transmission |
(8.43 MB) |
81 |
National Electricity Plan Notification (Amendment) Rules, 2023 |
05/07/2023 |
R&R |
(965.75 KB) |
82 |
Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision- regarding |
04/07/2023 |
FSC |
(3.17 MB) |
83 |
Transmission System Evaculation of Power From RE Projects in Solapur (1500 MW) Sez in Maharashtra |
30/06/2023 |
Transmission |
(6.85 MB) |
84 |
Seeking comments on Draft Electricity (Amendment) Rules, 2023 |
29/06/2023 |
R&R |
(6.43 MB) |
85 |
Amendment in the SBDs for procurement of ISTS through TBCB process (inclusion of provisions of Aggregate Capital Cost ur.r.t. HVDC Systems |
21/06/2023 |
Transmission |
(3.23 MB) |
86 |
Waiver of Inter-State Transmission Charges on transmission of the electricity generated from solar and wind sources of energy under Para 6.4 (6) of the Tariff Policy, 2016 - Consolidated Orders |
21/06/2023 |
RCM |
(10.53 MB) |
87 |
Appointment to the post of Chairman in Damodar Valley Corporation (DVC) on deputation basis through Search-cum-Selection Committee (SCSC) -reg |
20/06/2023 |
DVC |
(2.58 MB) |
88 |
Electricity (Rights of Consumers) Amendment Rules, 2023 |
17/06/2023 |
R&R |
(674.63 KB) |
89 |
Delegation of power for approval under provision of Section 68 and Section 164 of the Electricity Act, 2003 |
12/06/2023 |
Powergrid |
(4.75 MB) |
90 |
Guidelines for Tariff Based Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems |
12/06/2023 |
Transmission |
(949.34 KB) |