DD/MM/YYYY
Sr. No Subject Date Division Download / Link
61 RFP notification and RFP Documents for Selection of the Transmission Service Provider for establishing transmission system for “Eastern Region Expansion Scheme-XXXIV (ERES-XXXIV)” 10/07/2023 Transmission (8.43 MB)
62 National Electricity Plan Notification (Amendment) Rules, 2023 05/07/2023 R&R (965.75 KB)
63 Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision- regarding 04/07/2023 FSC (3.17 MB)
64 Transmission System Evaculation of Power From RE Projects in Solapur (1500 MW) Sez in Maharashtra 30/06/2023 Transmission (6.85 MB)
65 Seeking comments on Draft Electricity (Amendment) Rules, 2023 29/06/2023 R&R (6.43 MB)
66 Amendment in the SBDs for procurement of ISTS through TBCB process (inclusion of provisions of Aggregate Capital Cost ur.r.t. HVDC Systems 21/06/2023 Transmission (3.23 MB)
67 Waiver of Inter-State Transmission Charges on transmission of the electricity generated from solar and wind sources of energy under Para 6.4 (6) of the Tariff Policy, 2016 - Consolidated Orders 21/06/2023 RCM (10.53 MB)
68 Appointment to the post of Chairman in Damodar Valley Corporation (DVC) on deputation basis through Search-cum-Selection Committee (SCSC) -reg 20/06/2023 DVC (2.58 MB)
69 Electricity (Rights of Consumers) Amendment Rules, 2023 17/06/2023 R&R (674.63 KB)
70 Delegation of power for approval under provision of Section 68 and Section 164 of the Electricity Act, 2003 12/06/2023 Powergrid (4.75 MB)
71 Guidelines for Tariff Based Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems 12/06/2023 Transmission (949.34 KB)
72 Transmission Scheme for integration of REZ (Phase-II) in Koppal-II (Ph-A & B) and Gadag-II (Ph-A) in Karnataka, allocated to PFCCL to act as BPC to be implemented through TBCB mode 29/05/2023 Transmission (7.28 MB)
73 Electricity (Promoting Renewable Energy Through Green Energy Open Access) (Second Amendment) Rules, 2023 24/05/2023 R&R (639.08 KB)
74 Vacancy Circular dated 17.05.2023 for the post of Member, Joint Electricity Regulatory Commission (JERC) for Manipur & Mizoram 18/05/2023 R&R (3.28 MB)
75 Bidding Documents for Procurement of Aggregate Power requirement of Group of States for undertaking tariff based competitive bidding for medium term procurement of Power under para B (v) of Shakti Policy, 2017 17/05/2023 Transmission (3.41 MB)
76 Determination of Green Tariff under Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 and Implementation of the Rules 16/05/2023 RCM (798.69 KB)
77 Selection for the post of Chairman & Managing Director (CMD), Power Grid Corporation of India Limited (PGCIL) 12/05/2023 Powergrid (170.8 KB)
78 Vacancy Circular dated 2.05.2023 for the post of Member, CERC 02/05/2023 R&R (6.65 MB)
79 Engagement of retired Central Government Employees as consultant in Hindi Division of Ministry of Power 28/04/2023 Admin II (2.3 MB)
80 Seeking comments on Draft Electricity(Amendment) Rules, 2023 20/04/2023 R&R (1.45 MB)
81 Scheme for Pooling of Tariff of those plants whose PPAs have expired 20/04/2023 RCM (8.48 MB)
82 Initiation of the bidding process for North Eastern Region Expansion Scheme-XVI (NERES-XVI) through Tariff Based Competitive Bidding process TBCB project 18/04/2023 Transmission (5.57 MB)
83 Guidelines to Promote Development of Pump Storage Projects (PSP) 10/04/2023 Hydel II (12.93 MB)
84 Bid Documents for selection of TSP for establishing transmission system for “Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part- 1) (Bikaner Complex): PART-C” 31/03/2023 Transmission (4.26 MB)
85 Bid Documents for selection of TSP for establishing transmission system for “Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part- 1) (Bikaner Complex): PART-D” 31/03/2023 Transmission (5.06 MB)
86 Fair distribution of available domestic coal 24/03/2023 FSC (1.24 MB)
87 Draft Electricity (Rights of Consumers) Amendement Rules, 2023 24/03/2023 R&R (1.35 MB)
88 Appointment to the post of member (grid operation and distribution) in the central electricity authority, on deputation/short-term contract basis inviting applications for - regarding 16/03/2023 Admin I (8.08 MB)
89 Invitation for e-Tender for Procurement of power from Gas Based Power plants by NTPC Vidyut Vyapar Nigam Limited (Nodal Agency) 12/03/2023 Thermal I (4.26 MB)
90 Supply of Fly ash to the end users by the Power Plants to increase fly ash utilization 10/03/2023 State Thermal (3.8 MB)

Pages