Sr. No | Subject | Date | Division | Download / Link |
---|---|---|---|---|
61 | Proposal for amendment of Bureau of Energy Efficiency (BEE's) Recruitment Rules notified vide G.S.R. 1125(E) dated 31.08.2017 | 05/09/2023 | EC | (4.96 MB) |
62 | Draft Electricity Distribution (Accounting aspects of Specified Items & Additional Disclosure) Rules, 2023 reg | 04/09/2023 | Act & Notifications | (2.73 MB) |
63 | Direction to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines | 02/09/2023 | FSC | (875.68 KB) |
64 | Draft Electricity Distribution (Accounting aspects of Specified Items & Additional Disclosure) Rules, 2023 reg | 02/09/2023 | Distribution | (1.45 MB) |
65 | National Framework for promoting Energy Storage Systems - August 2023 | 01/09/2023 | NRE | (205.15 KB) |
66 | Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Projects dated 21.08.2023 | 21/08/2023 | Powergrid | (1007.96 KB) |
67 | Appointment of Smt. Parminder Chopra, Director (Finance), PFC Ltd. to the post of CMD, PFC quirement w.r.t. HVDC system) | 14/08/2023 | PFC | (318.31 KB) |
68 | Amendment in the SBDs for procurement of Inter-State Transmission Services through Tariff Based Competitive Bidding (TBCB) process (Technical Qualification Requirement w.r.t. HVDC system) | 09/08/2023 | Transmission | (1.26 MB) |
69 | Selection for the post of Chairman & Managing Director, North Eastern Electric Power Corporation Limited (NEEPCO), a schedule 'A' CPSE | 08/08/2023 | Hydel I | (2.41 MB) |
70 | Electricity (Second Amendment) Rules, 2023 | 31/07/2023 | R&R | (627.77 KB) |
71 | Appointment to the post of Director(Technical), Punatsangchhu-I Hydroelectric Project Authority(PHPA-I) in Bhutan | 31/07/2023 | BBMB | (843.53 KB) |
72 | Engagement of retired Governments servants as Consultants in the Bureau of Energy Efficiency on contract basis | 31/07/2023 | BEE | (7.21 MB) |
73 | Strict compliance of the provisions of Flag Code of India, 2002 [as amended in 2021 & 2022] and the Prevention of Insults to National Honour Act, 1971 | 28/07/2023 | Coordination | (3.4 MB) |
74 | Appointment to the post of Executive Director (ED) in REC Limited on deputation | 27/07/2023 | RE | (607.06 KB) |
75 | Electricity (Amendment) Rules, 2023 | 14/07/2023 | R&R | (4.77 MB) |
76 | RFP notification and RFP Documents for Selection of the Transmission Service Provider for establishing transmission system for “Eastern Region Expansion Scheme-XXXIV (ERES-XXXIV)” | 10/07/2023 | Transmission | (8.43 MB) |
77 | National Electricity Plan Notification (Amendment) Rules, 2023 | 05/07/2023 | R&R | (965.75 KB) |
78 | Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector- Revision- regarding | 04/07/2023 | FSC | (3.17 MB) |
79 | Transmission System Evaculation of Power From RE Projects in Solapur (1500 MW) Sez in Maharashtra | 30/06/2023 | Transmission | (6.85 MB) |
80 | Seeking comments on Draft Electricity (Amendment) Rules, 2023 | 29/06/2023 | R&R | (6.43 MB) |
81 | Amendment in the SBDs for procurement of ISTS through TBCB process (inclusion of provisions of Aggregate Capital Cost ur.r.t. HVDC Systems | 21/06/2023 | Transmission | (3.23 MB) |
82 | Waiver of Inter-State Transmission Charges on transmission of the electricity generated from solar and wind sources of energy under Para 6.4 (6) of the Tariff Policy, 2016 - Consolidated Orders | 21/06/2023 | RCM | (10.53 MB) |
83 | Appointment to the post of Chairman in Damodar Valley Corporation (DVC) on deputation basis through Search-cum-Selection Committee (SCSC) -reg | 20/06/2023 | DVC | (2.58 MB) |
84 | Electricity (Rights of Consumers) Amendment Rules, 2023 | 17/06/2023 | R&R | (674.63 KB) |
85 | Delegation of power for approval under provision of Section 68 and Section 164 of the Electricity Act, 2003 | 12/06/2023 | Powergrid | (4.75 MB) |
86 | Guidelines for Tariff Based Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems | 12/06/2023 | Transmission | (949.34 KB) |
87 | Transmission Scheme for integration of REZ (Phase-II) in Koppal-II (Ph-A & B) and Gadag-II (Ph-A) in Karnataka, allocated to PFCCL to act as BPC to be implemented through TBCB mode | 29/05/2023 | Transmission | (7.28 MB) |
88 | Electricity (Promoting Renewable Energy Through Green Energy Open Access) (Second Amendment) Rules, 2023 | 24/05/2023 | R&R | (639.08 KB) |
89 | Vacancy Circular dated 17.05.2023 for the post of Member, Joint Electricity Regulatory Commission (JERC) for Manipur & Mizoram | 18/05/2023 | R&R | (3.28 MB) |
90 | Bidding Documents for Procurement of Aggregate Power requirement of Group of States for undertaking tariff based competitive bidding for medium term procurement of Power under para B (v) of Shakti Policy, 2017 | 17/05/2023 | Transmission | (3.41 MB) |
*