Ministry of Power Home
A A+ A- Facebook Twitter
  • English
  • हिन्दी
Home
  • About Us
    • Responsibilities
    • Organisational setup of Ministry
    • Organisations under MoP
    • Unit wise work Allocation in Ministry of Power
    • Channel of submission
    • Structure of Ministry
  • RTI
    • About RTI Act
    • Public Information Officers
    • Proactive Disclosures
    • Organisation - Work and Responsibilities
    • Upload RTI Online Application/Appeal
    • RTI MIS for CPIOs/ First Appellate Authorities
  • Tenders
  • Grievance
    • Complaint Committee under Sexual Harassment
    • Public Grievance
  • Contact us
    • Hon'ble Minister of Power & Minister of State for Power
    • Head of Office/Section
    • All Ministry Officials
    • Chief controller of accounts
    • Attached offices/Autonomous bodies/PSUs/Research & Training Institute etc
    • Link Officer Arrangement
    • Nodal Officer (Website)
  • Screen Reader

POWERTHON-2022-Enabling Advanced Technologies in Power Distribution

  • Acts & Rules
    • Bidding Guidelines and Bidding Documents for procurement of Power
    • Electricity Act, 2003
    • Energy Conservation Act, 2001
    • DVC Act 1948
    • Status
  • Generation
    • Overview
    • Power Sector at a Glance ALL INDIA
    • Generation Capacity
    • Capacity Addition Programme - XII Plan & Beyond
    • Generation Reports
    • Protection of Environment
    • ULTRA MEGA POWER PROJECTS
    • Renovation and Modernization
    • Power System
    • MoU with NHPC
  • Transmission
    • Overview
    • Creation of National Grid
    • Major Grid Substations of POWERGRID
    • Milestones
    • International Cooperation
    • National Electricity Plan II
    • Green Energy Corridor
    • GoI funded Schemes
    • CTU and STUs
    • Private Participation
    • Power Grid
    • MoUs with POWERGRID
    • Important Orders/ Guidelines/ Notifications/ Reports
    • Tenders for TBCB Transmission Projects
    • 500GW Nonfossil Fuel Target
  • Distribution
    • National Electricity Fund
    • MoUs Between MoP and PFC
    • National Smart Grid Mission(NSGM)
    • Integrated Power Development Scheme(IPDS)
    • DDUGJY
    • Saubhagya
  • Revamped Distribution Scheme
    • Overview
    • Office Memorandum
    • Guidelines
    • Standard Operating Procedure
    • Energy Accounting Guidelines
    • Integrated Rating of State Power Utilities
    • Performance Report of State Power Utilities
    • Ease of Doing Business - Getting Electricity
    • UDAY
    • Web-Portal Revamped Distribution Sector Scheme
  • Energy Conservation & Energy Transition
    • Overview
    • Rules/Regulations under Energy Conservation Act, 2001
    • Electric Vehicle
  • Research & Training
    • Training
    • Training Institutes
    • Research and Development
    • Research Institutes
  • Dashboards/Portals
    • Revamped Distribution Sector Scheme
    • National Power Portal
    • NFMS Portal
    • Vidyut Pravah
    • UJALA
    • Deep e-Bidding
    • TARANG
    • Saubhagya Dashboard
    • PRAAPTI
    • SAMARTH Portal
  • ETWG G20
    • About G20
    • Energy Transitions Working Group
    • PM Speech
    • G20 / ETWG Documents
    • Studies
    • Delegate Experience
    • Press Releases
  • Current Notices
  • Press Releases
  • Photo Gallery
  • Search Report
  • Mar27
    Directions to Imported Coal-Based generating company under Section 11 of the Electricity Act, 2003 (56.78 KB, pdf)
  • Mar25
    Filling up one anticipated vacancy of Secretary in the Bureau of Energy Efficiency in Level- 13 of Pay Matrix on deputation basis-reg. (1.67 MB, pdf)
  • Mar16
    Inviting applications for the post of Executive Director (ED) in REC Limited on deputation - extension of timeline for submission of applications - reg. (1.72 MB, pdf)
  • Mar16
    Electricity (Amendment) Rules, 2026 alongwith Explanatory Note (891.34 KB, pdf)
  • Mar12
    Seeking comments on Draft Electricity (Rights of Consumers) Amendment Rules, 2026 (5.12 MB, pdf)

View All

Home » Announcements
  • Sep17
    Request For Qualification Document For Shortlisting Of Bidders As Transmission Service Provider To Establish Transmission System For “additional Inter-regional Ac Link For Import Into Southern Region I.e. Warorawarangal And Chilakaluripeta hyderabad- Kurnool 765kv Link” Through Tariff Based Competitive Bidding Process
  • Sep17
    Revised RfQ notice and Revised RfQ Documents for Selection of the Transmission Service Provider for establishing transmission system for "Additional Inter Regional AC Link for import into southern Region i.e Warora-Warangal and Chilakalupeta-Hydrabad-Kurnool 765kV link"
  • Sep17
    Global Invitation for qualification
  • Sep03
    Ease of Doing Business (EDB)- the new mechanism for release of electricity connection.OM/Mechanism
  • Sep03
    Ease of Doing Business (EDB)- the new mechanism for release of electricity connection.OM/Mechanism
  • Aug31
    A.C Static Connected Watt Hour Smart Meter class 1 and 2-specifications (Standard No. IS16444) available on Bureau of Indian Standards website
  • Aug30
    Surrendered share of power by States in various power stations
  • Aug25
    Third Annual Integrated Rating of State Distribution Utilities
  • Aug20
    Amendments to the Guidelines and Model Bidding Documents (MBDs) for procurement of electricity for Medium Term from Thermal Power Stations set up on Finance, Own and Operate (FOO) basis:
  • Aug17
    MOU 2015-16 between Ministry of Power, Govt. of India and Power finance Corporation Ltd.

Pages

  • « first
  • ‹ previous
  • …
  • 76
  • …
  • next ›
  • last »

View All

No Node Selected
  • Terms & Conditions
  • Web Information Manager
  • Citizen Charter
  • Copyright Policy
  • INTRANET
  • Website Policies
  • Feedback
  • Sitemap
  • HELP
  • Related Links

This website belongs to Ministry of Power Govt. of India, Shram Shakti Bhawan, Rafi Marg, New Delhi-1
Hosted by National Informatics Centre (NIC)