Ministry of Power Home Home
A A+ A- Facebook Twitter Instagram Skip to main content
  • English
  • हिन्दी

Search form

Home
  • About Us
    • Responsibilities
    • Organisational setup of Ministry
    • Organisations under MoP
    • Unit wise work Allocation in Ministry of Power
    • Channel of submission
    • Structure of Ministry
  • RTI
    • About RTI Act
    • Public Information Officers
    • Proactive Disclosures
    • Organisation - Work and Responsibilities
    • Upload RTI Online Application/Appeal
    • RTI MIS for CPIOs/ First Appellate Authorities
  • Tenders
  • Grievance
    • Complaint Committee under Sexual Harassment
  • Contact us
    • Hon'ble Minister of Power & Minister of State for Power
    • Head of Office/Section
    • All Ministry Officials
    • Attached offices/Autonomous bodies/PSUs/Research & Training Institute etc
    • Link Officer Arrangement
    • Nodal Officer (Website)
  • Screen Reader
Azadi ke Amrit Mahotsav Swach Bharat Abhiyan G20
  • Acts & Rules
    • Electricity Act, 2003
    • Energy Conservation Act, 2001
    • DVC Act 1948
    • Status
  • Generation
    • Overview
    • Power Sector at a Glance ALL INDIA
    • Generation Capacity
    • Capacity Addition Programme - XII Plan & Beyond
    • Generation Reports
    • Protection of Environment
    • ULTRA MEGA POWER PROJECTS
    • Renovation and Modernization
    • Power System
    • MoU with NHPC
  • Transmission
    • Overview
    • Creation of National Grid
    • Major Grid Substations of POWERGRID
    • Milestones
    • International Cooperation
    • National Electricity Plan II
    • Green Energy Corridor
    • GoI funded Schemes
    • CTU and STUs
    • Private Participation
    • Power Grid
    • MoUs with POWERGRID
    • Important Orders/ Guidelines/ Notifications/ Reports
    • Tenders for TBCB Transmission Projects
    • 500GW Nonfossil Fuel Target
  • Distribution
    • National Electricity Fund
    • MoUs Between MoP and PFC
    • National Smart Grid Mission(NSGM)
    • Integrated Power Development Scheme(IPDS)
    • DDUGJY
    • Saubhagya
  • Revamped Distribution Scheme
    • Overview
    • Office Memorandum
    • Guidelines
    • Standard Operating Procedure
    • Energy Accounting Guidelines
    • Integrated Rating of State Power Utilities
    • Performance Report of State Power Utilities
    • Ease of Doing Business - Getting Electricity
    • UDAY
    • Web-Portal Revamped Distribution Sector Scheme
  • Energy Conservation & Energy Transition
    • Overview
    • Rules/Regulations under Energy Conservation Act, 2001
    • Electric Vehicle
  • Research & Training
    • Training
    • Training Institutes
    • Research and Development
    • Research Institutes
  • Dashboards/Portals
    • Revamped Distribution Sector Scheme
    • National Power Portal
    • UDAY Dashboard
    • Vidyut Pravah
    • UJALA
    • Deep e-Bidding
    • TARANG
    • Saubhagya Dashboard
    • PRAAPTI
    • SAMARTH Portal
  • ETWG G20
    • About G20
    • Energy Transitions Working Group
    • PM Speech
    • G20 / ETWG Documents
    • Studies
    • Delegate Experience
    • Press Releases
    • G20 Gallery

Transmission

  • Overview
  • Creation of National Grid
  • Major Grid Substations of POWERGRID
  • Milestones
  • International Cooperation
  • National Electricity Plan II
  • Green Energy Corridor
  • GoI funded Schemes
  • CTU and STUs
  • Private Participation
  • Power Grid
  • MoUs with POWERGRID
  • Important Orders/ Guidelines/ Notifications/ Reports
  • Tenders for TBCB Transmission Projects
  • 500GW Nonfossil Fuel Target
Home » Content » 500GW Nonfossil Fuel Target

500GW Nonfossil Fuel Target

Additional initiatives to achieve 50% cumulative electric power installed capacity from non-fossil fuel-based energy resources by 2030. 

Govt. of India has set a target for establishing 50% cumulative electric power installed capacity from non-fossil fuel-based energy resources by 2030.  In this regard, the following additional initiatives have been taken toward integration of Renewable power in the grid:

a. Transmission schemes for integration of 66.5GW renewable generation in states like Rajasthan, Gujarat, Maharashtra, Madhya Pradesh, Karnataka, Andhra Pradesh and Tamil Nadu have been planned and are under various stages of implementation.
b. About 55.08 GW of renewable potential has been identified in Rajasthan, Gujarat, Himachal Pradesh and Ladakh for which planning of transmission system has been carried out and the implementation of the same would be taken up.
c. About 33.35 GW of renewable generations can be integrated into the ISTS grid through margins at various existing/ under construction ISTS S/s.
d. For the remaining capacity addition, SECI has preliminarily identified 181.5GW potential Renewable Energy Zones in 8 states viz. Andhra Pradesh, Karnataka, Telangana, Rajasthan, Maharashtra, Madhya Pradesh and Offshore wind at Gujarat & Tamil Nadu with various Hybrid & Solar locations planned with Storage (BESS of 43.6GW). In this regard, a report for transmission system for integration of over 500GW of nonfossilfuel-based generation capacity by 2030 has been prepared by Central Electricity Authority.

About 51,000ckm of transmission lines and 4,33,500MVA of transformation capacity is expected to be added in the ISTS network at an estimated cost of about ₹ 2,44,000Cr. These transmission schemes include various high capacity 765kV and 400kV EHVAC transmission lines and ±800kV & ±350kV HVDC lines

Page Updated On: 18/09/2023
  • Terms & Conditions
  • Web Information Manager
  • Citizen Charter
  • Copyright Policy
  • INTRANET
  • Website Policies
  • Feedback
  • Sitemap
  • HELP
  • Related Links

STQC Certification Badge

This website belongs to Ministry of Power Govt. of India, Shram Shakti Bhawan, Rafi Marg, New Delhi-1
Hosted by National Informatics Centre (NIC)

Last Updated on: 19 May 2025