Ministry of Power Home
A A+ A- Facebook Twitter
  • English
  • हिन्दी
Home
  • About Us
    • Responsibilities
    • Organisational setup of Ministry
    • Organisations under MoP
    • Unit wise work Allocation in Ministry of Power
    • Channel of submission
    • Structure of Ministry
  • RTI
    • About RTI Act
    • Public Information Officers
    • Proactive Disclosures
    • Organisation - Work and Responsibilities
    • Upload RTI Online Application/Appeal
    • RTI MIS for CPIOs/ First Appellate Authorities
  • Tenders
  • Grievance
    • Complaint Committee under Sexual Harassment
  • Contact us
    • Hon'ble Minister of Power & Minister of State for Power
    • Head of Office/Section
    • All Ministry Officials
    • Attached offices/Autonomous bodies/PSUs/Research & Training Institute etc
    • Link Officer Arrangement
    • Nodal Officer (Website)
  • Screen Reader

POWERTHON-2022-Enabling Advanced Technologies in Power Distribution

  • Acts & Rules
    • Electricity Act, 2003
    • Energy Conservation Act, 2001
    • DVC Act 1948
    • Status
  • Generation
    • Overview
    • Power Sector at a Glance ALL INDIA
    • Generation Capacity
    • Capacity Addition Programme - XII Plan & Beyond
    • Generation Reports
    • Protection of Environment
    • ULTRA MEGA POWER PROJECTS
    • Renovation and Modernization
    • Power System
    • MoU with NHPC
  • Transmission
    • Overview
    • Creation of National Grid
    • Major Grid Substations of POWERGRID
    • Milestones
    • International Cooperation
    • National Electricity Plan II
    • Green Energy Corridor
    • GoI funded Schemes
    • CTU and STUs
    • Private Participation
    • Power Grid
    • MoUs with POWERGRID
    • Important Orders/ Guidelines/ Notifications/ Reports
    • Tenders for TBCB Transmission Projects
    • 500GW Nonfossil Fuel Target
  • Distribution
    • National Electricity Fund
    • MoUs Between MoP and PFC
    • National Smart Grid Mission(NSGM)
    • Integrated Power Development Scheme(IPDS)
    • DDUGJY
    • Saubhagya
  • Revamped Distribution Scheme
    • Overview
    • Office Memorandum
    • Guidelines
    • Standard Operating Procedure
    • Energy Accounting Guidelines
    • Integrated Rating of State Power Utilities
    • Performance Report of State Power Utilities
    • Ease of Doing Business - Getting Electricity
    • UDAY
    • Web-Portal Revamped Distribution Sector Scheme
  • Energy Conservation & Energy Transition
    • Overview
    • Rules/Regulations under Energy Conservation Act, 2001
    • Electric Vehicle
  • Research & Training
    • Training
    • Training Institutes
    • Research and Development
    • Research Institutes
  • Dashboards/Portals
    • Revamped Distribution Sector Scheme
    • National Power Portal
    • UDAY Dashboard
    • Vidyut Pravah
    • UJALA
    • Deep e-Bidding
    • TARANG
    • Saubhagya Dashboard
    • PRAAPTI
    • SAMARTH Portal
  • ETWG G20
    • About G20
    • Energy Transitions Working Group
    • PM Speech
    • G20 / ETWG Documents
    • Studies
    • Delegate Experience
    • Press Releases
    • G20 Gallery
  • Current Notices
  • Press Releases
  • Photo Gallery
  • Search Report
  • May06
    Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2025-reg. (1.13 MB, pdf)
  • May02
    Invitation of Expression of Interest (Eol) for empanelment of Independent Experts for constitution of Conciliation Committees for dispute resolution. (6.72 MB, pdf)
  • Apr15
    Seeking comments on Draft amendments proposed in the Model Bidding Documents (MBDs) for Procurement of Power for Long Term from Thermal Power Stations set up on Design, Build, Finance, Own, and Operate (DBFOO) basis-Reg (6.74 MB, pdf)
  • Apr07
    Vacancy Circular dated 7.04.2025 for the post of Technical Member, APTEL (3.59 MB, pdf)
  • Apr03
    Amendment in Standard Bidding Documents for procurement of Inter-State Transmission Services through Tariff Based Competitive Bidding (TBCB) process (1.62 MB, pdf)

View All

Home » Announcements
  • Dec23
    Modification of the scheme of Budgetary Support for the cost Enabling infrastructure for Hydroelectric Projects
  • Dec12
    Selection for the post of Director (Projects), REC Ltd. a schedule A, CPSE
  • Dec05
    Vacancy Circular for the post of Member (RE), CEA
  • Nov28
    Vacancy Circular dated 28.11.2024 for the post of Chairperson, JERC for UT of J&K and UT of Ladakh
  • Nov28
    Request for comments on amendment in draft Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 — reg
  • Nov12
    Extension of timeline for submission of the comments - Amendments to the Guidelines for TBCB for procurement of power from Grid Connected power projects
  • Nov08
    Workforce Adequacy Guidelines for Load Despatch Centres and Guidelines for deputation of Workforce from SLDCs to Grid-India for fixed terms
  • Oct28
    Seeking comments on Amendment to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid connected Power Projects
  • Oct26
    Seeking comments on draft Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2024
  • Oct25
    Selection for the post of CMD, NTPC Ltd - reg.

Pages

  • « first
  • ‹ previous
  • …
  • 3
  • …
  • next ›
  • last »

View All

No Node Selected
  • Terms & Conditions
  • Web Information Manager
  • Citizen Charter
  • Copyright Policy
  • INTRANET
  • Website Policies
  • Feedback
  • Sitemap
  • HELP
  • Related Links

This website belongs to Ministry of Power Govt. of India, Shram Shakti Bhawan, Rafi Marg, New Delhi-1
Hosted by National Informatics Centre (NIC)