Inter Regional Transmission Capacity --- Program of National Grid Development (in MW)

 Break-up Capacity At the end of 10th Plan 11th Plan Addition Capacity At the end of XIth Plan 12th Plan Addition 12th Plan Addition Expected at the end of 12th Plan 12th Plan Actual Achievement

Commulative 12th Plan Addition (Upto Mar-17)

Capacity As on Date (Upto Mar-17)
  Actual Actual Actual Target Expected 12-13 (Actual) 13-14 (Actual) 14-15 (Actual) 2015-16 (Actual) 2016-17(Upto Mar-17)
  1 2 3 4 4A 5(3+4A) 6 7 8 9 10 11=(6+7+8+9+10) 12=(3+11)
ER - NR 3430 8700 12130 5800 5800 17930 0 2100 0 1600 3700 7400 19530
ER - WR 1790 2600 4390 8400 8400 12790 0 2100 4200 2100 0 8400 12790
ER - SR 3130 500 3630 0 0 3630 0 0 0 0 4200 4200 7830
ER – NER 1260 0 1260 1600 1600 2860 0 0 1600 0 0 1600 2860
Sub Total 9610 11800 21410 15800 15800 37210 0 4200 5800 3700 7900 21600 43010
WR - NR 2120 2100 4220 10200 12700 16920 2000 2500 0 4200 2500 11200 15420
WR - SR 1720 (-)200* 1520 6400 6400 7920 0 2100 2100 2200 4200 10600 12120
Sub Total 3840 1900 5740 16600 19100 24840 2000 4600 2100 6400 6700 21800 27540
NR - NER 0 0 0 6000 6000 6000 0 0 0 1500 3000 4500 4500
132kV (Inter Regional) 600 0 600 0 0 0 0 0 0 0 0 0 600
Grand Total 14050 13700 27750 38400 40900 68050** 2000 8800 7900 11600 17600 47900 75050**
* 200 MW of Bursur -Lower Sileru HVDC monopole is not in operation
* *Inter-regional transmission Capacity at the end of 12th Plan excludes 600 MW of  132 / 110 kV lines operated in radial mode time to time